Closing : 31 Dec 2026 Updated : 09 Apr 2026

FPP Preparatory studies for hydroelectric production projects and access to electricity

Energy and Mining — Guinea

Add to favorites
Login required
PDF
Login required

Description

The Preparatory Studies for Hydropower Production and Electricity Access Projects (FPP) aims to finance and conduct the preliminary studies essential for structuring future hydropower projects in Guinea. This involves carrying out in-depth analyses (technical, economic, financial, environmental, and social) to ensure the soundness of future investments in the hydropower sector, including the strengthening of electricity access networks in targeted areas.

Objectives

📊 Project Financing:
Ensuring the eligibility and attractiveness of future projects for both public and private funding.

⚙ Technical Structuring:
Conducting detailed studies (feasibility and engineering) essential for the realization of hydroelectric projects.

⚡ Energy and Electricity:
Defining and implementing effective strategies to improve the national electricity coverage rate.

💼 Institutional Capacity Building:
Providing support to EDG and its partners in improving their energy planning methods.

Complete sheet available

Log in to download the complete PDF sheet and access exclusive resources.

Log in to download

Explore other programs

Discover similar programs based on the same countries, sectors or donors

© 2026 Miradi Media. All rights reserved. An initiative by Fanaka&Co.